|  Register
You are here : Pay My Bill  >  Look up...


A dollar bill broken into sections, showing in cents how much of your property taxes go to different areas. In the City of Wayland, 27 cents go to the City itself, 61 cents to education (including 29 cents for Wayland Union Schools Operating Costs, 14 cents for Wayland Union Schools Debt Repayment, 10 cents for State Education Tax and 8 cents for the Intermediate school), 10 cents go to Allegan County (including 7 cents for County Operating Costs, and 1 cent each for the County Road Commission, Senior Services, and County Medical Care Facility), and 2 cents for the Henika District Library.  2021 Fee Schedule (Updated January 2021)

City of Wayland Fee Schedule			 GENERAL		PROPERTY TAX FEES/LEVIES	 Accident Report 	$10.00	City Charter Property Tax/Levy	16.3607 NSF Checks plus Bank Fees	$25.00	Wayland Union Schools Operating Tax/Levy	18 Marriage Ceremonies 	$50.00	Wayland Union Schools Debt Repayment	8.4 Copies (per side) 	$0.10	Intermediate Schools Tax/Levy	4.9032 Dog Licenses 		State Education Tax/Levy	6 Puppy (age 4 mo. To 12 mo.) 		Allegan County Operating Tax/Levy	4.5125 1 year	$5.00	Allegan County Roads Tax/Levy	0.9857 Spayed/Neutered		Allegan County Senior Services Tax/Levy	0.4859 1 year	$5.00	Allegan County Medical Facility Tax/Levy	0.25 3 years	$12.00	Henika District Library Tax/Levy	1.3554 Male/Female License 		Residential Recycling (annual)	$50.00  1 year	$10.00		 3 years	$25.00	PARKING VIOLATIONS 	 		Overtime Parking	$5.00 ZONING   		Double Parking 	$5.00 Site Plan Review	$300.00	Fire Lane Parking 	$5.00 Special Use Permit	$300.00	Loading Zone Parking 	$5.00 Zoning Variance	$300.00	Wrong Direction Parking	$5.00 Re-zoning Request	$300.00	Alley Parking 	$5.00 Zoning Text Amendment	$75.00	Prohibited Area Parking	$5.00 Agricultural Zoning Compliance	$35.00	Parking in a Cross Walk	$5.00 Land Division	$75.00	Parking in a Restricted Zone 	$5.00 Land Transfer	 $75.00 	Parking in a Handicapped Zone	$5.00 		Parking Too Close to Fire Plug	$5.00 ELECTRICAL PERMIT		Parked Across Lines	$5.00 Permit Base Fee	$40.00	Parked Too Close To Intersection	$5.00 Final Inspection 	$40.00	Parking Obstructing Traffic Lane	$5.00 Rough In Inspections	$40.00	Front Yard Parking	$5.00 Re-inspection	$40.00	Unregistered Vehicle 	$5.00 Underground/Pool Bonding	$40.00	Parking Blocking Private Driveway	$5.00 Additional Inspection 	$40.00	Parking Over Sidewalk	$5.00 Inspections, hourly rate	$50.00		 Electrical Services through 600 amp Permanent and Temp	$20.00	MECHANICAL PERMIT: SINGLE FAMILY/ADDITIONS/REMODELING	 600 amp -- 800 amp	$20.00	Permit Base Fee	$40.00 Over 800 amp 	$25.00	Final inspections, Additional inspections	$40.00 Sub Panel	$5.00	Underground Inspection	$40.00 Circuits, each	$4.00	Rough-in inspection	$40.00 Light fixtures per 25 and fraction thereof	$5.00	Inspections, hourly rate	$50.00 Dishwasher, garbage disposal, and range hood, each	$4.00	Inspections not requiring a permit	$75.00 Furnace, unit heaters	$5.00	Furnances, heat pumps, boilers, fireplaces, solid fuel equipment, complete woodstoves	$20.00 Electrical heating units (baseboards), each	$4.00	Add on furnaces and water heaters, each	$20.00 Power outlets (including ranges, dryers, etc.), each	$4.00	Chimney factory built	$15.00 Exhaust and ventilation fans	$5.00	Duct system or hydronic piping	$10.00 Signs, per circuit	$5.00	Solar equipment, piping fee included	$15.00 Feeders, bus ducts, etc. per 50 ft. & fraction thereof	$6.00	Gas piping new installaion	$10.00 Mobile home park site, each	$6.00	Exhaust fans, each	$3.00 Recreational vehicle park site, each	$6.00	LPG piping fee	$10.00 K.V.A. & H.P., each up to 20 K.V.A. or H.P. 	$4.00	Central Air Conditioning 	$15.00 over 20 K.V.A. or H.P 	$8.00	Single Family (new)	$160.00 Fire alarms up to 10 stations and horns	$50.00	Duplex (new) 	$210.00 11 to 20 stations and horns	$100.00		 over 20 stations and horns, each	$5.00	MECHANICAL PERMIT: COMMERCIAL/INDUSTRIAL	 New Residential 		Permit Base Fee	$40.00 New Single Family Dwelling	$160.00	Final inspections, Additional inspections	$40.00 Duplex	$210.00	Underground Inspection	$40.00 Special inspections not requiring permits 	$75.00	Rough-in inspection	$40.00 		Inspections, hourly rate	$50.00 BUILDING PERMIT		Inspections not requiring a permit	$75.00 Application	$40.00	Gas/oil burning equipment (New or Conversion)	$30.00 		Gas piping, each outlet new installation	$4.00 SEWER		Solar equipment, each panel & tank, piping fee included	$15.00 Sewer Connection Fee	$4,185.00	Air Conditioning and Refrigeration heat pumps, self contained: 	 Sewer Inspection Fee	$19.00	Under 15 HP a/c, each	$15.00 Sewer Readiness to Serve In City (Per EDU/Quarter)	$12.42	Evaporator coils, each	$25.00 1"	$25.25	Under 5 HP, Split System, each	$25.00 1.25"	$33.65	5HP and over, split system, each	$35.00 1.5" 	$39.40	Chiller, each	$80.00 2" 	$62.10	Fireplace	$30.00 3"	$197.50	Chimney factory built	$15.00 4"	$258.75	Cooling towers, each	$35.00 6" 	$790.00	Compressor 15 HP to 50 HP, each	$30.00 Usage in City per 1,000 Gallons 	$3.57	Over 50 HP, each	$50.00 Umetered Usage in City 	$24.87	Air handlers, self-contained units	 Sewer Readiness to Serve Outside City (Per EDU/Quarter)	$18.40	Ventilation & Exhaust fans under 15000CFM, each	$5.00 1"	$37.88	1500 CFM to 10,000 CFM, each	$25.00 1.25"	$50.48	Over 10,000 CFM, each	$50.00 1.5"	$59.10	heat recovery and wall fan coils, each	$10.00 2" 	$93.15	unit heaters, each	$15.00 3"	$296.25	Ducts, insulation, piping, fire suppression/protection systems, baseboard	 4"	$388.13	Based on bid price	 6" 	$1,185.00	under $3000	$30.00 Usage Outside City per 1,000 Gallons 	$5.36	$3000 to $7999	$40.00 Umetered Usage Outside City 	$31.97	$8,000 to $10,999	$50.00 		Over $11,000 ($10.00 for each $3,000.00 in additon to above rate)	$60.00 WATER		Fire supression plan review fee	$100.00 Water Connection Fee	$3,035.00	Incinerators, each	$15.00 Lateral Installation 1" 	$500.00	Crematories, each	$15.00 Lateral Installation over 1" 	By Owner	Humidifiers, each	$10.00 Water Readiness to Serve In City (Per EDU/Quarter)	$13.00	Electronic air cleaner with washer, each	$30.00 1"	$21.71		 1.5"	$43.29	PLUMBING PERMIT	 2" 	$69.29	Permit Base Fee	 $40.00  3"	$130.00	Final Inspection  	 $40.00  4"	$216.71	Rough In Inspections	 $40.00  6" 	$433.29	Re-inspection	 $40.00  Usage in City per 1,000 Gallons 	$2.75	Underground	 $40.00  Water Readiness to Serve Outside City (Per EDU/Quarter)	$19.50	Inspection, hourly rate	 $50.00  1"	$32.57	Subsoil Drains, each	 $5.00  1.5" 	$65.04	Fixtures, each	 $5.00  2" 	$103.94	Stacks, Vents and Roof Conductors	 $5.00  3"	$195.00	Sewers, each (city sewer)	 $10.00  4"	$325.07	Water services, each (city water)	 $10.00  6" 	$649.94	Utility Holes, Catch Basins, each	 $5.00  Usage Outside City per 1,000 Gallons 	$4.00	Sewage Pumps, sewage injectors, each	 $5.00  Water Turn On for Non Payment	$50.00	Water distributing pipe (systems)	 Water Turn On for Non Payment After Hours	$110.00	up to one inch	 $5.00  Water Turn On Request--Vacant Property 	$20.00	over one inch	 $20.00  Portable Summer Meter Deposit	$25.00	Reduced pressure zone backflow preventer, each	 $5.00  Portable Summer Meter Fee	$10.00	Water connected appliances, equipment and devices, each	 $2.00  Meter Check-- Up to 2" 	$15.00	All drains and traps, each	 $2.00  Summer Water Tap On Fee	$200.00	Laboratory, hospital, clinic fixtures, equipment and devices, each	 $2.00  0.75" Meter with Clamps	$185.00	Medical Gas Piping, per opening (includes certificate)	 $20.00  1" Meter with Clamps	$280.00	Water Heater Including Inspection	 $45.00  1.5" Meter with Clamps	$1,225.00	New Single Family Residence 	 $160.00  2" Meter with Clamps	$1,455.00	New Duplex	 $210.00  		Pre-Manufactured Dwelling w/o a basement	 $40.00  		Inspections not requiring a permit	 $75.00